Transducers and transformers
Transformers and transducers are two ways of managing and monitoring electrical energy, often used interchangeably, although they are different.
[edit] Transformer
A transformer might be used to step down or reduce a current to a more usable level, particularly if an electric current is too powerful for a specific piece of equipment or where the primary current is being measured on the basis of Faraday's Law of induction. Transformers work with two sets of coils, one which take in the higher input current and the other that outputs the lower current that is of stepped down by a certain ratio to make it useable.
[edit] Transducer
A transducer, converts electrical energy into other types of energy and is used in applications such as microphones, car horns, and photoelectric cells. Current transducers, in particular, convert alternating current (AC) to direct current (DC) and are used for example in control systems that monitor electricity usage.
[edit] Related articles on Designing Buildings
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.